Product features
-
Using water as the dispersion medium, it is green and environmentally friendly.
-
It has a breathable function and can be applied on damp substrates.
-
Convenient for construction, fast drying and high construction efficiency;
-
The coating has a smooth and clean appearance with good decorative properties.
-
Epoxy material, non-toxic coating
Scope of application
It is widely used for interior wall decoration and protection in villas, hotels, hospitals, schools, office buildings and homes.
| Technical Indicators | |||
| Performance Category | Performance Parameter | Technical Index (GB/T22374-2018) | Test Result |
| Drying Time | Surface Dry, h | ≤ 8 | 3 |
| Actual Dry, h | ≤ 48 | 24 | |
| Hardness | Pencil Hardness (Scratch) | ≥ Agreed | 3H |
| Abrasion Resistance | 750g/500r | ≤ 0.05 | 0.03 |
|
Water Resistance |
168h | No blistering, no peeling; slight discoloration allowed | Compliant |
| Chemical Resistance | Oil Resistance (120# Solvent Gasoline, 72h) | No blistering, no peeling; slight discoloration allowed | Compliant |
| Alkali Resistance (20% NaOH, 72h) | |||
| Acid Resistance (10% H₂SO₄, 48h) | |||
| Matching Instructions | |||||
| Coating Layer | Material Model | Packaging Specification | Mixing Ratio | Single Coat Usage (kg/㎡) | Single Coat Thickness (mm) |
| Primer | WEDO-5601 Waterborne Epoxy Wall Primer | 20KG/5KG | 4:01 | 0.15 | 0.12 |
| Topcoat | WEDO-5603 Waterborne Epoxy Matt Wall Topcoat | 20KG/4KG | 5:01 | 0.3 (applied in 2 coats) | 0.15 |
Notes
-
The construction environment temperature should be between 0 and 35℃. During outdoor construction in summer, it is necessary to avoid high temperatures and rain exposure.
-
For floors with severe sanding and dusting, the amount of primer used will increase. It is recommended to use the primer to fully penetrate and reinforce until the overall color of the concrete is uniform without whitening, to avoid peeling and hollowing of the floor.
-
When applying the topcoat by roller, it is necessary to ensure that the overall amount is uniform. There should be no flowing or piling of materials, otherwise the problem of mottling will occur.
-
After the colored paint is applied, the topcoat must be completed within the specified time; otherwise, it will affect the adhesion of the topcoat layer.
-
Topcoats containing red pigment are not suitable for varnishing.
Technical Statement
Our company can design construction plans of different specifications (thickness, effect, etc.) through flexible matching and combination of various products to meet the personalized requirements of all kinds of customers. To ensure that your project can select the appropriate floor system, please consult our professional technical advisors. However, when using our company's products, please strictly follow the construction process, dosage requirements and precautions of the product. Otherwise, our company will not bear any responsibility for the quality of the project or any losses.
| Construction Process | ||
| Process Name | Specific Methods and Requirements | Single Coat Usage (kg/㎡) |
| Substrate Treatment |
1. New wall: Thoroughly remove surface dust, oil stains and loose mortar; repair pores promptly to ensure the wall is clean, dry and flat. 2. Re-coating: Completely scrape off existing paint film and putty; remove surface dust, level and sand, then clean and fully dry to avoid old wall issues (e.g., odor, mold) affecting construction results. Inspect the substrate before painting; start coating only after it passes inspection. |
/ |
| Primer Layer |
1. Use WEDO-5601 waterborne epoxy wall primer: Stir for at least 3 minutes until uniform and fully emulsified. 2. Apply evenly by roller coating or spray coating. |
0.15 |
| Topcoat Layer |
1. Use WEDO-5603 waterborne epoxy matte wall topcoat: Mix base paint and curing agent in proportion, stir until uniform and fully emulsified. 2. Apply evenly (no gaps) in 2 coats; spray coating is also acceptable. |
0.3 |
Construction section
Construction conditions
-
Air temperature: 0℃ - 35℃
-
Relative humidity < 80%
-
The moisture content of the substrate surface is less than 8%
-
The construction site should have good ventilation
-
Dew point temperature: The substrate and the substrate of the uncured coating must be at least 3℃ higher than the dew point temperature to reduce the risk of condensation or mottling of the ground coating. The ground with oil stains must be thoroughly cleaned; otherwise, it may affect the uniform application of the coating.
Indonesian
Malay
Vietnamese
Slovenian
Slovak
Latvian
Bosnian
Icelandic
Ukrainian
Georgian
Serbian
Croatian
Belarusian
Romanian
Estonian
Hungarian
Czech
Catalan
Norwegian
Lithuanian
Albanian
Hindi
Italian
Finnish
Arabic
Danish
Bulgarian
Thai
Polish
Swedish
Greek
Portuguese
Dutch
Turkish
Russian
Deutsch
French
Korean
Japanese
English